NASA LaRC Transition to Stage 2 on July 12, 2021

LaRC Deputy Center Director Dave Young requested that the following announcement be shared with LaRC Contractors Steering Council members.

Effective Monday, July 12, Langley Research Center will transition to Stage 2 of the Agency Framework for Return to On-site Work.

At this time, the Federal occupancy limit remains in place, which means that we will not see immediate changes to the level of on-site work. However, this transition prepares us for when the Agency is approved to expand capacity beyond 25%. It also positions us for Stage 1.

Like our previous transitions, your health, safety, and well-being remain our top priority and as such we have used a methodical, risk-based, and data-driven approach to decide when we can responsibly move to Stage 2. As outlined in the June 29 Town Hall:

  • The local region meets all COVID-19 criteria for Stage 2.
  • At the beginning of June, the seven-day testing positivity in Virginia was 2.3% and region 5 was 4.0%. All localities within the Langley catchment area showed a seven-day case rate per 100,000 below 10/100,000 putting region 5 at Low Transmission rate.
  • All facilities and systems on-site are available to meet mission requirements.
  • Center Operations has implemented multiple facility COVID-19 mitigations, including increased HVAC ventilation, purchased 90 touchless water fountain bottle fillers (33 installed to date) and installed HVAC MERV-13 filters and 50 bipolar ionization units for HVAC air handler units. The LENEL access control system also remains available for contact tracing.

Additionally, we will monitor and follow guidance provided via the Safer Federal Workforce Task Force.

What remains the same from Stage 3

On-site projects activities must be approved through the Return to On-site Work (RTOW 2.0) process. Employees who must be on-site to perform their work may return with center/supervisor approval. All other personnel will continue to telework.

We will continue to actively manage who is accessing the center in order to adhere to capacity limitations and ensure contact tracing protocols are in place, if needed.

All personnel will follow the latest facility safety protocols.

What changes from Stage 3

The work that will be allowable on-site will expand beyond mission critical activities with Directorate level approval.

You can review the latest guidance from the Agency regarding travel for fully vaccinated personnel by clicking here.

Visitors required for approved on-site activities will be allowed with Directorate level approval.

We will continue to review options for food service, daycare, and the fitness center.

To facilitate the transition on July 12, we are updating our return to on-site work materials. We appreciate your patience as we work through this process.

Our ability to transition is in large part due to your vigilance, in our work and in the community during this challenging time. Stay tuned for additional guidance as the Agency works through the Federal occupancy limit and we continue to make strides in our transition.

LaRC Contractors Steering Council Meeting – November 19, 2020

Join us for the virtual Langley Contractor’s Steering Council (LCSC) meeting Thursday, November 19, at 2:00 pm. This month’s keynote speaker is Dave Bowles, who will talk about Virginia Institute for Spaceflight and Autonomy. This month’s Center status will be presented by Donna Lawson, who will share  what is happening in Legislative Affairs. Susan McClain, Director of the Office of Procurement, will also provide Return to Onsite Work and LaRC OP updates.

Use the link below to join the meeting.

Join Microsoft Teams Meeting

Our meeting will address these topics:

  • VASBA Update– Laura Blumberg
  • LaRC OP Update – Susan McClain
  • RTOW Update – Susan McClain
  • Small Business Update – Rob Betts
  • Partnerships Update – Carrie Rhoades
  • Legislative Affairs Update – Donna Lawson
  • Virginia Institute for Spaceflight and Autonomy – Dave Bowles
  • Special Topics and Look Ahead

LaRC OP and RTOW Slides by Susan McClain, November 19, 2020

LaRC Small Business Update Slides by Rob Betts, November 19, 2020

Virginia Institute for Spaceflight and Autonomy Overview Slides by Dave Bowles, November 19, 2020

LaRC Contractors Steering Council Meeting – October 15, 2020

Join us for the virtual Langley Contractor’s Steering Council (LCSC) meeting Thursday, October 15, at 2:00 pm. This month’s keynote speaker is Tonya Kiefer, who will talk about Sustainable Acquisition for Contractors. This month’s directorate update will be presented by Tara Tveten, who will share an overview of the Center Operations Directorate. Susan McClain, Director of the Office of Procurement, will also provide Return to Onsite Work and LaRC OP updates.

Use the link below to join the meeting.

Join Microsoft Teams Meeting

Our meeting will address these topics:

  • VASBA Update– Laura Blumberg
  • LaRC OP Update – Susan McClain
  • RTOW Update – Susan McClain
  • Small Business Update – Rob Betts
  • Partnerships Update – Carrie Rhoades
  • Sustainable Acquisition for Contractors – Tonya Kiefer
  • Directorate Update from Center Operations – Tara Tveten
  • Special Topics and Look Ahead

LaRC OP and RTOW Slides by Susan McClain, October 15, 2020

LaRC Small Business Update Slides by Rob Betts, October 15, 2020

Sustainable Acquisition for Contractors Slides by Tonya Kiefer, October 15, 2020

LaRC Contractors Steering Council Meeting – September 17, 2020

Join us for the virtual Langley Contractor’s Steering Council (LCSC) meeting Thursday, September 17, at 2:00 pm. This month’s keynote speaker is Dawn Schaible, Director of the Engineering Directorate. Susan McClain, Director of the Office of Procurement, will also provide Return to Onsite Work and LaRC OP updates.

Use the link below to join the meeting.

Join Microsoft Teams Meeting

Our meeting will address these topics:

  • VASBA Update– Laura Blumberg
  • LaRC OP Update – Susan McClain
  • RTOW Update – Susan McClain
  • Small Business Update – Rob Betts
  • Partnerships Update – Carrie Rhoades
  • Diversity Dialogue: Gender Identity in the Workplace – Charles Cockrell and Rob Lee
  • Directorate Update from Engineering – Dawn Schaible
  • Special Topics and Look Ahead

LaRC Small Business Update Slides September 17, 2020, by Rob Betts

LCSC Presentation September 17, 2020, by Susan McClain

ED Overview for LCSC September 17, 2020, by Dawn Schaible

Gender Identity for LCSC September 17, 2020, by Charles Cockrell

PPP Forgiveness Presentation on September 9, 2020 at 10:00 AM

With the moving target that is the details on the SBA’s Payroll Protection Program, it should come as little surprise clients that were able to get it now wonder if they have to pay it back, or how much. Join ODU Institute for Innovation & Entrepreneurship and BB&T on September 9, 2020 from 10:00 AM to 12:00 PM to for a virtual discussion of what you need to know to be prepared when completing the PPP Loan Forgiveness Application.

How do I fill out PPP forgiveness application/Process?
How do I make sure my PPP loan is forgiven?
When do I pay it back?

Application Review Process and Timeline (Financial Institution and SBA)

Legislative Changes:

  • Giving borrowers 24 weeks to spend the funds instead of eight
  • Giving borrowers more time to rehire employees without losing forgiveness eligibility
  • Extending the period of time during which borrowers can apply for forgiveness
  • Documents required (Payroll, FTE and Non-payroll. This documentation will need to be submitted with the PPP Loan Forgiveness Application)

FAQ’s and more!

This workshop will be presented via Google Meet. All registered participants will be emailed the link to join prior to the event. Registration will close Tuesday, September 8, at noon to ensure all participants receive link to join in time to test connection/download app if applicable.

Click here for registration link.